检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:纪先志[1]
机构地区:[1]中国建筑第二工程局有限公司(沪),上海200135
出 处:《施工技术》2013年第10期73-78,共6页Construction Technology
基 金:中国建筑第二工程局科研项目:住宅产业化全预制整体式框架结构综合施工技术
摘 要:某保障房项目选用全预制装配整体式钢筋混凝土框架加钢支撑结构体系,首先讲述了工程的施工工艺流程和操作要点,总结了全预制结构吊装的机具选择,构件的吊装顺序,安装就位,梁板柱节头的连接,支撑体系和防护体系的搭设,围护结构,整体卫浴的安装等预制构件吊装、组装施工工艺,最后重点讲述了全预制构件的安装要点。A indemnificatory residential project adopted a system of prefabricated integral reinforced concrete frame with steel supports.This paper firstly illustrates the construction process and key points of operation.It then summarizes the hoisting and assembly of prefabricated components,including the selection of the hoisting machines,the hoisting sequence,installation of the components,the connection of beams,slabs and columns,the construction of the support system and the enclosure structure and installation of integral toilet,etc.At last,the key points for the installation of prefabricated components are described in detail.
分 类 号:TU741[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222