检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李友谊[1] 杨晓强[1] 李文双[1] 姚进国[1] 李载鹏[1]
机构地区:[1]中核集团江苏核电有限公司,江苏连云港222042
出 处:《原子能科学技术》2013年第B06期160-163,共4页Atomic Energy Science and Technology
摘 要:田湾核电站1号机组第5次换料大修期间,根据燃料组件检查结果,开展了紧急换料设计。1号机组第6循环堆芯装载策略具有不同于正常换料的特点,例如燃料装载不对称、部分辐照过的燃料组件移动到对称象限、堆芯功率分布不对称等。另外,堆芯装载策略考虑了TVS-2M先导燃料组件的位置要求。经第6循环寿期初物理试验和堆内测量系统验证,堆芯装载方案设计结果满足各项测量准则要求,且堆芯运行参数符合设计预期。During the 5th refueling outage of Tianwan Nuclear Power Station Unit 1,according to the fuel assembly inspection results,emergency refueling design has been carried out.The in-core loading scheme of Unit 1 Cycle 6 has special characteristics from normal refueling.For example,fuel loading is asymmetry,some burned fuel assemblies are moved to symmetrical sectors,and in-core power distribution is asymmetry etc.In addition,in-core loading scheme has been considered the requirement on positions of TVS-2M pilot fuel assemblies.Verified by physics tests and in-core measurement system at beginning of cycle 6,design results of in-core loading pattern meet all measurement criteria and requirements,and in-core operation conditions conform to design anticipate.
分 类 号:TL326[核科学技术—核技术及应用]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28