某大型水电站取消厂坝间压力钢管伸缩节研究  被引量:7

Numerical analysis and verification of penstocks without contraction joints for large hydropower station

在线阅读下载全文

作  者:赵德海[1] 董毓新[1] 陈婧[1] 

机构地区:[1]大连理工大学土木工程系,辽宁大连116024

出  处:《大连理工大学学报》2000年第4期496-499,共4页Journal of Dalian University of Technology

基  金:中国长江三峡工程开发总公司资助项目 !( ZT- 98( II) - 3)

摘  要:通过对某大型水电站进行三维有限元计算分析 ,得出了厂坝间垫层管的变位及受力情况 ,为取消厂坝间压力钢管伸缩节提供实际工程论证 ,并提出了取消厂坝间伸缩节后所应采取的有利结构措施和施工过程 。Through the three dimension finite element analysis on the large hydropower station, this paper obtains the displacements and stress conditions of the penstocks with cushion layer between the powerhouses and dams. It can be used as practical project evidence. This paper also puts forward some favorable structural measures and constructral process, which should be adopted after canceling the contraction joints. It is a good example for the construction of the same kind of the projects afterwards.

关 键 词:组合应力 伸缩节 水电站 压力钢管 厂房  

分 类 号:TV732.41[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象