500kV香山变电站接地网安全性状态评估及整改  被引量:7

Safety Evaluation and Rectification for 500 kV Xiangshan Substation Grounding Grid

在线阅读下载全文

作  者:李谦[1] 杨劲松 

机构地区:[1]广东电网公司电力科学研究院,广东广州510080 [2]广东电网公司中山供电局,广东中山528400

出  处:《广东电力》2013年第5期87-92,共6页Guangdong Electric Power

摘  要:针对变电站发生接地短路故障时,设备场区电位差和接触电压偏高的问题,基于现场实际测量和接地分析软件CDEGS(current distribution,electromagnetic field,grounding and soil structure analysis)数值计算,对500kV香山变电站接地网安全性状态进行评估。通过仿真计算,提出在高接触电压值的区域采用加密水平接地网格,在高接触电压值场的区地面铺设高阻砾石或高阻层,设备外壳喷涂高阻层等整改措施。实施整改措施后,变电站运行情况表明整改工程达到了提高接地网安全性的目的。Aiming at problem of high potential difference and contact voltage in equipment area when happening grounding short circuit fault in substation, this paper studies safety evaluation of 500 kV Xiangshan substation grounding grid based on locale practical measurement and grounding analysis software CDEGS to proceed numerical calculation. By simulation calculation, it proposes to use grounding grid with encryption level and lay high resistance gravel or layer on the ground surface in the high contact voltage area and spray high resistance layer on the shell of equipment. After carrying out above rectification measures, the practical operational state of substation shows that the rectification engineering is successful in promoting safety of the grounding network.

关 键 词:接地分析软件 数值仿真 接地网 安全性状态评估 接触电压 

分 类 号:TM862.3[电气工程—高电压与绝缘技术]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象