喀斯特地质条件下机械冲孔桩卡锤原因及对策  被引量:1

Hammer Reasons and Countermeasures of Mechanical Punching Pile in Karst Geological Conditions

在线阅读下载全文

作  者:覃彬 

机构地区:[1]广西建工集团 第三建筑工程有限责任公司,广西柳州545002

出  处:《企业科技与发展》2013年第6期95-96,共2页Sci-Tech & Development of Enterprise

摘  要:广西属于典型的喀斯特地质,溶洞、裂隙发育充分,岩面倾斜角度大小不一,地质情况复杂。在建筑工程中采用桩基础时,目前多数采用机械冲孔成桩。但此法在施工中经常会遇到卡锤现象,处理不好会影响工程施工进度和成孔质量。找出卡锤原因并制定对策,可提高冲孔效率和保证施工质量。Guangxi behmgs t. the typical karst geoh^gy, which has the typical eharacteristies in aspects of the karst cave and crack dew-lopment fldly, different oblique angle size on the rocks, complicated geological conditions. Mechanical punching pile use.I widely at presenl when pile fotmdalion is adopted in the construction engineering. But this method often enctmntez,'s card hammer in construction, it will affects the project constmctian schedule and the quality of the hale if we cannot deal with. Finding out the reas.ns of carol hammer and fm'mulating countermeasures can improve the efficiency of punching pile and en- sure constrm.liml quality.

关 键 词:喀斯特地质 机械冲孔桩 卡锤 原因分析 对策 

分 类 号:TU753.3[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象