检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《广西大学学报(自然科学版)》2000年第1期78-82,共5页Journal of Guangxi University(Natural Science Edition)
基 金:国家自然科学基金!59867001;广西"十百千人才工程"基金!桂人函 [1 998]35
摘 要:提出了一种电力系统经济调度的现代内点算法.它克服了传统方法中难以精确处理不等式约束的弊端,使计算结果更精确;同时采用了一种变量重组和矩阵既约的技术,减少了计算量,加快计算速度.计算结果表明,将现代内点算法用于电力系统的经济调度是非常有效的.The paper presents a new algorithm for solving the economic load dispatch problem in power systems by modern interior point (IP) method. On one hand, this algorithm can handle inequality constraints conveniently, which is very difficult in the traditional methods, in this way the computational results are more accurate. On the other hand, smaller computational efforts and computational efficiency are achieved by rearrangement variable and reduced correction equation. Numerical simulations have shown that the IP method is an effective method for solving the economic dispatch problem in the power systems.
分 类 号:TM731[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.14.152.212