检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]铜陵有色金属集团股份有限公司冬瓜山铜矿 [2]中南大学资源与安全工程学院
出 处:《现代矿业》2013年第6期19-22,26,共5页Modern Mining
摘 要:冬瓜山铜矿是我国首批迈入深部开采的矿山之一,采用空场回采嗣后充填采矿方法,"隔一采一"的回采顺序,因此作为矿柱采场的采准巷道受到高应力的作用。基于冬瓜山矿柱采场的采准巷道钢筋混凝土支护结构存在裂缝的这一工程问题,结合现场巷道实际情况,创建结构力学分析模型,对其支护结构进行了内力分析,找出产生裂缝的原因,提出合理的应对措施。As one of the first mines which step into deep mining in China, Dongguashan copper mine uses open stope back -filling mining method with "one partition one" recovery order, therefore mining preparatory tunnel in pillar stope often under high stress. To solve the engineering problem of cracks existing in the reinforced concrete supporting structure of mining preparatory tunnel of Dongguas- ban pillar stope, combined with practical situation of site tunnel, a structural mechanics analysis model was created. Internal force was analyzed with support structure, and formation reason of crack was found. In the end, some reasonable engineering countermeasures and suggestions are proposed.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229