大型水电站发变组联合单元接线主保护配置方案探讨  

Study on Configuration Plan for Main Protection of United Generator-Transformer Unit Connection in Large-scaled Hydropower Stations

在线阅读下载全文

作  者:何璐[1] 何苗[1] 谈静[1] 马力[1] 冯汉夫[1] 万小娜[1] 

机构地区:[1]中国水电顾问集团西北勘测设计研究院,西安710065

出  处:《西北水电》2013年第3期70-72,90,共4页Northwest Hydropower

摘  要:近年来大型水电站多采用联合单元接线的主接线方式。文章结合工程实例,主要对主变及主变高压侧引出线的保护配置方案进行了分析,并介绍主变高压侧电流互感器的选型问题,最终对联合单元接线的主保护配置方案提出了建议。In recent years, the united generator-transformer unit connection is applied by most large-scaled hydropower stations. In this paper, in combination with engineering practice, the configuration plan for protection of main transformer and outgoing line at HV side of the main transformer is analyzed and type selection of CT at HV side of the main transformer is introduced as well. Finally, tips on con- figuration plan for main protection of united generator-transformer unit connection are raised.

关 键 词:发变组 联合单元 高压侧 保护 配置方案 水电站 

分 类 号:TM774[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象