检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]水力发电设备国家重点实验室,哈尔滨150040 [2]哈尔滨大电机研究所,哈尔滨150040
出 处:《水科学与工程技术》2013年第3期52-56,共5页Water Sciences and Engineering Technology
摘 要:结合藏木水电站高比转速水轮机参数优化项目,通过CFD分析,对模型水轮机的蜗壳、尾水管、转轮等水力过流部件进行了全面优化设计。通过模型试验验证,藏木水电站水轮机水力性能研究达到了预期目标,CFD分析结果与模型试验结果基本吻合,为高比转速转轮的水力性能优化提供参考。Base on optimization design of high specific speed Francis turbine of Zangmu power station, this paper presents the whole optimization design procedure of hydraulic flow passage components of model turbine through CFD analyze, such as spiral case, draft tube, runner etc.The model test results show that all the performance of hydraulic turbine of the Zang- mu power station meet the expected characteristic. The CFD analyzed results are coincidence with model test results. It can give some reference to the hydraulic optimization of high specific speed runner.
分 类 号:TK730.2[交通运输工程—轮机工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222