峡江水利枢纽工程Ⅲ标混凝土施工设备优化配置  被引量:1

Optimization for Concrete Construction Machines in the Bidding 3 Project in Xiajiang Hydro-junction Project

在线阅读下载全文

作  者:甘果[1] 梁云亮[1] 范贵隆[1] 

机构地区:[1]武警水电第二总队,江西南昌330096

出  处:《施工技术》2013年第12期65-67,共3页Construction Technology

摘  要:峡江水利枢纽Ⅲ标工程施工,是主汛期在左河床上进行截流、开挖和混凝土浇筑等施工,安全度汛风险大,且有工期紧、强度大、难度大的特点;筛分和拌合系统必须持续高效生产,混凝土要有足够运输能力和入仓手段;施工设备能否优化配置是决定混凝土施工成败的关键。在对工程节点工期、设备技术性能和市场信息等方面进行综合分析论证的基础上,确定并完成了施工设备的优化配置。The construction of bidding 3 project in Xiajiang Hydro-junction project includes closure,excavation and concrete pouring on the left river bed in major flood period which is big for flood control safety risk.The construction has characteristics of short construction period,high working strength and construction difficult.During construction,concrete must be produced continuously and effectively and be transported and be poured quickly which need concrete construction machines to be optimized.Based on comprehensive analysis on the key construction joint,performance of machine and market information,construction machines are optimized successfully.

关 键 词:混凝土 施工设备 优化配置 

分 类 号:TU642[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象