输水线路过小江活动断裂带方案研究  被引量:3

Scheme study of water conveyance structure crossing Xiaojiang active fault zone

在线阅读下载全文

作  者:朱国金[1] 李云[1] 凌云[1] 

机构地区:[1]中国水电顾问集团昆明勘测设计研究院,云南昆明650051

出  处:《人民长江》2013年第12期37-40,共4页Yangtze River

摘  要:牛栏江-滇池补水输水工程线路分别穿越云南省小江活动断裂带中段的东支和西支,两断裂均为全新世活动断裂,构造变形量大、地震烈度高。在分析小江区域活动断裂带对输水工程影响的基础上,提出了过小江区域活动断裂带的输水建筑物特殊结构方案,并采用数值分析方法深入研究了结构方案适应较大构造变形的能力和抗震性能。结果表明,该结构方案可以较好适应活动断裂带的大变形和强地震作用。Niulan River - Dianchi Lake Water Supplement Project crosses the east and west branches of the middle section ol Xiaojiang active fault zone in Yunnan Province, which are holocene active fault with large structural deformation and high seismic intensity. On the basis of analyzing the influence of active fault zone in Xiaojiang Region on the water conveyance structure, the special structural scheme for the water conveyance structure crossing the Xiaojiang active fault zone is proposed. For the structural scheme, its ability of adapting to large structural deformation and the seismic behavior are further studied. It shows that this scheme can adapt to the large deformation of the active fault zone and strong seismic action.

关 键 词:构造变形 高地震烈度 倒虹吸 小江活动断裂带 

分 类 号:TV67[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象