检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国水电顾问集团昆明勘测设计研究院,云南昆明650051
出 处:《人民长江》2013年第12期37-40,共4页Yangtze River
摘 要:牛栏江-滇池补水输水工程线路分别穿越云南省小江活动断裂带中段的东支和西支,两断裂均为全新世活动断裂,构造变形量大、地震烈度高。在分析小江区域活动断裂带对输水工程影响的基础上,提出了过小江区域活动断裂带的输水建筑物特殊结构方案,并采用数值分析方法深入研究了结构方案适应较大构造变形的能力和抗震性能。结果表明,该结构方案可以较好适应活动断裂带的大变形和强地震作用。Niulan River - Dianchi Lake Water Supplement Project crosses the east and west branches of the middle section ol Xiaojiang active fault zone in Yunnan Province, which are holocene active fault with large structural deformation and high seismic intensity. On the basis of analyzing the influence of active fault zone in Xiaojiang Region on the water conveyance structure, the special structural scheme for the water conveyance structure crossing the Xiaojiang active fault zone is proposed. For the structural scheme, its ability of adapting to large structural deformation and the seismic behavior are further studied. It shows that this scheme can adapt to the large deformation of the active fault zone and strong seismic action.
分 类 号:TV67[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222