灌水法检测大颗粒碎石土压实度的应用分析  被引量:1

Water-Fill Method in the Measurement of the Degree of Compaction of Soils with Large Grain Size

在线阅读下载全文

作  者:陈家琼 

机构地区:[1]贵州有色地质工程勘察公司,贵阳550005

出  处:《土工基础》2013年第3期114-116,共3页Soil Engineering and Foundation

摘  要:贵州盘县某项目挖、填方工程地基采用强夯进行处理,现场采用灌水法进行压实度检测,最大干密度的确定采用室内击实试验及现场试验两种方法,通过试验成果的对比,表明室内击实试验剔除了大于40mm以上粒径的碎石土,与现场实际粒径不相符,应采用现场试验确定碎石土最大干密度。The site for the Coking Coal-Electricity-Steel integration project in Panxian County, Guizhou, is required to have high cut and high fills. The fill area is improved by the dynamic compaction and the degree of compaction after the compaction should be greater than 97 % of the maximum dry density. The water-fill method is used for the in situ density test. Comparing with the laboratory Proctor test results, it is found that the in situ testing is more realistic since soils with grain size larger than 40 mm are removed in the Proctor test.

关 键 词:压实度 最大干密度 室内击实试验 现场试验 

分 类 号:TU413[建筑科学—岩土工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象