检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]河海大学港口海岸与近海工程学院,南京210098
出 处:《水道港口》2013年第3期193-198,共6页Journal of Waterway and Harbor
基 金:国家高技术研究发展计划(863计划)(2012AA112509);2011年度江苏省研究生培养创新(CXZZ11_0449)
摘 要:海床冲刷可能导致海底输油管线裸露悬空,影响其运营安全。文章针对册镇海底输油管线沿线海床的冲刷现象,利用杭州湾大范围海域潮流数学模型和海床冲淤计算方法,分析了造成海床冲刷的原因,预测了冲刷的发展趋势。研究结果表明:册镇海底输油管线沿线海床冲刷主要与新泓口围垦的局部挑流及金塘大桥的阻水作用有关。随着规划围垦工程的实施,沿线部分海床还将进一步冲刷。Seabed erosion may lead to the phenomenon of pipeline hanging in the seawater and make troubles to the security operations of submarine pipeline. By using a tidal current numerical model for Hangzhou Bay and a method for the calculation of seabed erosion and siltation, the cause of the seabed erosion and the erosion trends along the submarine pipeline from Cezi Island to Zhenhai were studied. The research shows that the seabed erosion is mainly caused by the deflecting flow scour effect of Xin-Hongkou reclamation and the water-retardation effect of Jintang Bridge. With the implementation of the reclamation in the near future, part of the seabed along the submarine pipeline will be further eroded.
分 类 号:TV142[水利工程—水力学及河流动力学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117