检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:周斌[1] 刘斯宏[1] 姜忠见[2] 任涵璐[1] 王珊[1]
机构地区:[1]河海大学水利水电学院,江苏南京210098 [2]中国水电顾问集团华东勘测设计研究院,浙江杭州310014
出 处:《水力发电》2013年第7期20-23,共4页Water Power
摘 要:结合洪屏抽水蓄能电站,提出了一种适用于模拟复杂地下洞室群、密集排水孔幕和各种混合坝型的渗流场三维整体建模技术。首先通过计算机自动平面解码和结点对接技术完成超单元网格的生成,再利用超单元网格自动剖分和排水孔二次剖分技术精细模拟密集排水孔幕等渗控措施,实现了复杂地质条件和边界条件下抽水蓄能电站整体三维渗流有限元模型的自动生成,解决了独立模型边界不协调等一系列问题,为类似工程渗控优化前处理提供一种新的思路。Taking Hongping Pumped Storage Power Station project as a study case, the techniques of 3D FEM modeling are presented which can simulate the overall seepage field of underground powerhouse caverns, densely distributed drainage holes and various mixed type of dams. Firstly, the super-element meshes are generated through computer automatic plane decoding scheme and node docking technology, and then the seepage-control measures such as densely distributed drainage holes are precisely simulated by using the techniques of automatic division of super-element meshes and secondary division of drainage holes. The overall 3D seepage FEM model for pumped-storage power station with complex geological conditions and boundary conditions can be automatically generated by using these techniques and the problems of uncoordinated boundary between independent models can also be solved. These techniques provide a new way to the pre-treatment of seepage control optimization of similar projects.
关 键 词:渗流场 三维模型 超单元网格 二次剖分技术 洪屏抽水蓄能电站
分 类 号:TV743[水利工程—水利水电工程] TV139.14
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28