检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:宋凯[1]
机构地区:[1]上海市政工程设计研究总院(集团)有限公司,上海市200092
出 处:《城市道桥与防洪》2013年第6期71-73,18,共3页Urban Roads Bridges & Flood Control
摘 要:西宁市文汇路跨湟水河大桥为(24+65+158+65+24)m双塔五跨连续混凝土梁自锚式悬索桥,综述该桥设计与计算。该桥采用纵向半漂浮体系,设置纵向阻尼器控制梁端位移;主梁采用单箱三室混凝土截面,梁高2.2 m;桥塔采用门形框架混凝土结构,塔顶横梁采用矩形空心截面并设置预应力钢绞线;桥塔墩下部采用分离式承台,单个承台布置6根直径2.2 m钻孔灌注桩;主缆采用φ5.25 mm镀锌高强平行钢丝,吊索采用φ7.0 mm镀锌高强平行钢丝。计算分析结果表明该桥的各项检算均满足规范要求。The Huangshui River Bridge on Wenhui Road in Xining City is a double-pylon 5-span(24+65+158+65+24)-m continuous concrete self-anchored suspension bridge.The article summarizes the design and calculation of this bridge.The semi-floating system is used for this bridge with the longitudinal dampers to control the displacement at the end of the girder.The single-box three-cell concrete section is used for the main girder.The height of the girder is 2.2 m.The bridge pylon is a concrete portal frame structure.The cross beam at the top of the pylons is a rectangular hollow section in which the pre-stressing steel strands are used.The separated base slab is used at the lower of pylon pier.Each base slab is supported by 6 bored cast-in-place piles with 2.2-m diameter.The main cables are respectively made up of φ5.25mm galvanized high strength parallel steel wires.The suspension cables are of φ7.0mm galvanized high strength parallel steel wires.The results of the calculation and analysis indicate that all checking calculations of this bridge can satisfy the relevant requirements in the codes.
关 键 词:自锚式悬索桥 混凝土箱梁 混凝土主塔 主缆 阻尼器 桥梁设计
分 类 号:U448.25[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229