检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:谢新[1]
机构地区:[1]天津市海河建设发展投资有限公司,天津300010
出 处:《城市道桥与防洪》2013年第6期294-295,301,共3页Urban Roads Bridges & Flood Control
摘 要:天津中央大道海河隧道为北方地区首座沉管法施工的隧道。该文分别从管段平面形态、河床形态与航道要求、干舷高度、拖运沉放、干坞规模及管段接头位置等多方面比较了不同管段分节方案的优缺点。分析表明,两节管段方案在接头数量和干舷高度等方面有优势,而三节管段方案在沉管管段浮运和干坞选址方面具有明显优势。最后通过综合比较,推荐采用三节管段方案作为工程实施方案。Tianjin Central Avenue Haihe River Tunnel is the first tunnel constructed by the immersed tunneling method in the northern area.The article compares the advantages and disadvantages of the different pipe section schemes from the aspects of the pipe section plane shape,riverbed shape and channel requirement,freeboard height,hauling sinking,dry dock scale and pipe section join position.The result shows that the two-section pipe scheme has the advantage of the join quantity and freeboard height,and the three-section pipe scheme has the obvious advantage of immersed pipe floating hauling and the dry dock site selection.By the comprehensive comparison,the three-section pipe scheme is finally recommended as the engineering implementation scheme.
分 类 号:U455.46[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249