检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王宁[1]
机构地区:[1]广东省水文局广州水文分局,广东广州510150
出 处:《广东水利电力职业技术学院学报》2013年第2期1-4,共4页Journal of Guangdong Polytechnic of Water Resources and Electric Engineering
摘 要:2009年枯水期,石角站开始采用清远(三)站相应水位与该站实测流量定线推流,解决感潮为流量资料整编带来的难题。2011年11月,随着上游清远水利枢纽的蓄水,相应水位法已无法使用。为了解决该问题,探讨感潮时段的流量推求方法,建立了石角—三水(二)站日平均水位差与日平均流速之间的关系。结果表明,确定上下游站日平均水位差与日平均流速关系的方法是可行的。Shijiao Hydrometric Station began to use equivalent stage of Qingyuan (3) station and measured discharge on discharge computation to solve the new problems on discharge data processing which were brought by the tidal hy- drometry section in the low-flow period in 2009. In November 2011, with the storage of Qingyuan water conservancy hub, the method of equivalent stage Can not be used. In order to solve this problem, this paper discusses the method of discharge computation in tidal time and studies the relation between daily mean fall of Shijiao-Sanshui (2) station and daily mean velocity. The results show that the way of setting up the relation between daily mean fall of up-downstream and daily mean velocity is feasible.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:13.58.199.13