煤矿排水系统避峰填谷控制方案改进  被引量:4

Improvement of control scheme of peak load shafting of coal mine drainage system

在线阅读下载全文

作  者:蒋伟 

机构地区:[1]中煤科工集团常州自动化研究院,江苏常州213015

出  处:《工矿自动化》2013年第7期76-79,共4页Journal Of Mine Automation

基  金:中国煤炭科工集团有限公司科技创新基金项目(2011MS014)

摘  要:针对现有的煤矿排水系统避峰填谷控制方案存在水泵启停频繁等问题,提出通过细分水位及启泵数量、增加低谷调整时段及最后调整时段等方法对现有方案进行优化改进的方案,给出了避峰填谷的原则及改进方法的具体实现,并对原方案及改进方案的控制效果进行了对比分析。测试结果表明,改进后的避峰填谷控制方案在高峰时段的泵时缩短为改进前的33%,尖峰时段的泵时缩短为改进前的42%,提高了水泵运行效率。For problem that pumps start and stop frequently in existing control scheme of peak load shafting of coal mine drainage system,the paper proposed an improved scheme by adding water levels,raising number of activated pumps,increasing a trough adjustment period and the last adjustment period.It introduced principles of peak load shafting and implementation of the improved scheme,compared and analyzed control effects of the original scheme and the improved scheme.The testing results show that pumping time reduces to 33% in peak period and 42% in rush period of the improved scheme,which improves pump efficiency.

关 键 词:煤矿排水 排水系统 避峰填谷 节能减排 

分 类 号:TD636[矿业工程—矿山机电]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象