检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]河南省电力公司焦作供电公司,河南焦作454000 [2]河南煤化焦煤集团冯营电力有限责任公司,河南焦作454000 [3]国家电网运行分公司上海管理处,上海201708
出 处:《广东电力》2013年第6期26-29,共4页Guangdong Electric Power
摘 要:在10 kV配电网改造过渡时期,通过采用更改主变压器连接组别方式和联络变压器过渡形式,能很好地解决10 kV和20 kV的联络问题。结合不同供电区域的特性及用户侧周边电压等级情况,给出城市和农村区域以及用户侧升压改造方案,通过对各方案的结构及组成环节等方面进行分析,旨在解决不同供电区域升压改造的问题。During transitional period for reform of 10 kV distribution network, it is feasible to solve connection problems of 10 kV and 20 kV by changing connections of main transformer and transitional way of interconnecting transformer. Combining characteristics of different power supply areas and voltage grades around demand side, this paper proposes boosting reform schemes for cities, countries and demand sides. By analyzing structure and component parts of various schemes, it offers a proposal to solve problems of boosting reform in different power supply areas.
关 键 词:20 KV配电网 升压问题 变压器连接组别 联络变压器 不同供电区域 用户侧升压
分 类 号:TM751[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117