检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]西安交通大学能源与动力工程学院,陕西西安710049 [2]西安热工研究院有限公司,陕西西安710032
出 处:《电站辅机》2013年第1期20-22,共3页Power Station Auxiliary Equipment
摘 要:越来越多的城市郊区电厂改造成为热电厂。针对热网电厂运行中存在热网循环水加热不足、选择热网汽侧疏水注入系统的位置、热网回水管道补水标准的选择、热网除氧器的正常运行、热网循环水泵的调速运行和热网疏水泵的调速运行等方面的问题,进行了分析,并提出了措施。A growing number of city suburbs power plant transformed into thermal-power plant.In view of the problems in the operation of the heating network,including inadequate circulating water heating of heating network,the location choice of steam side drainage inlet system in heating network,the choice of the replenishment standards of heating network return pipe,the normal operation of the deaerator for the heating network,the speed control of the circulating pump and the speed control operation issues of heat supply network drain pump,etc.have been analyzed and countermeasures have been put forward in the paper.
关 键 词:热电厂 联产 供热 热网 除氧器 疏水泵 调速 方案
分 类 号:TM611[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.133.83.123