金沙江鲁地拉水电站上游过水围堰设计与运行  被引量:6

Design and operation of upstream overflow cofferdam for construction of Ludila Hydropower Station on Jinshajiang River

在线阅读下载全文

作  者:康文军[1] 黄天润[1] 冀培民[1] 杨鑫平[1] 罗林[1] 杨静安[1] 

机构地区:[1]中国水电顾问集团西北勘测设计研究院,陕西西安710065

出  处:《水利水电技术》2013年第6期86-89,共4页Water Resources and Hydropower Engineering

摘  要:鲁地拉水电站上游过水围堰采用土石—碾压混凝土混合过水围堰,该围堰建在深厚覆盖层上,具有大流量、高水头、长历时的过水特点。围堰建成后,经历3个汛期过水考验,运行良好。本文介绍该围堰的设计与运行情况,可供其他工程参考。The upstream overflow cofferdam for construction of Ludila Hydropower Station is an earth-rockfill-roller compacted concrete combined one, which is on a deep overburden layer and has the overflow characteristics of large flow rate, high head and long duration. After the completion, it experiences the overflows from three flood seasons with a better operation status. The design and operation of the cofferdam are described herein, so as to provide a reference for the other similar project.

关 键 词:鲁地拉水电站 过水围堰 大流量 高水头 长历时 

分 类 号:TV551.31[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象