检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]哈尔滨理工大学水力发电设备国家重点实验室,哈尔滨150040 [2]哈尔滨大电机研究所,哈尔滨150040
出 处:《黑龙江电力》2013年第3期253-255,267,共4页Heilongjiang Electric Power
摘 要:为研究葛洲坝二江水电站发电机增容改造的可行性,应用网络法和温度场的计算方法详细分析了机组的通风及定子温升情况,并在现场对5号机进行了通风实验,收集了运行数据。经对比,总风量和线棒温升的计算值与通风实验值和线棒温升折算值比较吻合,线棒温升在安全范围内,该机组可以增容。In order to study the feasibility of capacity increasing transformation for Gezhouba Erjiang Hydropower station generators,this paper utilizes the network method and the temperature field calculation method to analyze ventilation and temperature increase of stators. Through the on - site ventilation experiment on No. 5 unit, the operation data is acquired. By comparison, the total air volume and the calculated winding bar temperature increase relatively coincide with the experimental ventilation value and the conversed winding bar temperature increase, which is within safe range. The unit is feasible in capacity increase.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.4