检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国水电顾问集团成都勘测设计研究院,成都610072
出 处:《电力与能源》2013年第3期266-269,共4页Power & Energy
摘 要:峡谷及山地风电场有其特殊性,工程设计较平原风电场也有一定的难度。以四川省首个峡谷风电场示范工程为例,分析了峡谷风电场风能资源特性,并对该类风电场风能资源评估、微观选址等设计的关键技术进行研究,形成了有效的设计方法和经验。风电场实际运行结果验证该设计方法是可行的,对同类风电场设计具有一定的借鉴参考价值。It is more dificult for project design of canyon wind farm than plain. Take the canyon wind farm in Sichuan Dechang for example, this paper analyses the wind energy resource characteristics, and discuss the core content of project degign, such as wind energy resource assessment, wind farm sitting and so on, forming an effective design method and experience. The feasiblity of the design method for canyon wind farm is proved by the practice operation results, and the method has certain reference value for the design of similar wind farm.
分 类 号:TM61[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117