检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:胡凯凯[1] 翟大勇[1] 夏相春[1] 陈林[1] 许力伟[1]
机构地区:[1]南车株洲电力机车研究所有限公司,湖南株洲412001
出 处:《大功率变流技术》2013年第3期32-34,共3页HIGH POWER CONVERTER TECHNOLOGY
摘 要:当前风电场的有功功率控制分配策略多采用平均分配的方式,若风电场各机组的风速差异较大,很可能导致整个风电场的有功功率输出与网调指令存在较大的差距。对此,综合协调考虑风电机组的控制特性及其当前的平均有功功率、平均风速和运行状态等信息,提出一种新的有功功率指令分配策略,有效减小了风电场功率输出与网调指令值的差距,最大限度地减小限功率对业主造成的损失。Currently, average distribution is generally adopted for the active power control instruction of wind farms. If the wind speed differs much among wind turbines in the wind farm, the output active power of the wind farm may as well differ much from the instruction of the electricity grid. For this reason, a new distribution strategy of active power instruction is proposed by integrated consideration on parameters of each wind turbine, including control characteristics, average active power, average wind speed and operating state. This new strategy can effectively reduce the difference between the wind farm output active power and the grid instruction, so as to reduce the loss of wind farm owner due to active power restriction to the possible extent.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145