检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]上海电气电站设备有限公司发电机厂,200240
出 处:《电机技术》2013年第3期46-48,51,共4页Electrical Machinery Technology
摘 要:首台QFSN型700MW级水氢氢发电机的全部工厂试验已于2010年8月在上海发电机厂结束,目前该发电机在外方电厂现场完成安装。文章主要对QFSN型700MW级水氢冷发电机的工厂型式试验数据与设计值进行了比较及分析,表明该型号发电机的研制非常成功,具有优良的性能和可靠的设计,型式试验验证了各项主要技术指标符合设计要求。The whole factory test of the first 700 MW of Model QFSN turbine generator was finished within the Shanghai Electric Power Generation Co. Ltd. Generator Plant in Aug. 2010 and it has been installed at field site abroad. The test result of the first 700 MW of Model QFSN turbine generator was compared and analyzed with the de- signed data, came the conclusion that the development of this model of the generator achieved the great success. The generator possessed excellent performance and reliable de- sign, the type test of it verified that main technical data met with the requirement of the design.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145