广佛地铁终点站调车方式办理折返作业的乘务风险及控制措施  

Analysis of Guangzhou-Foshan Metro Terminals with Shunting of Crew Risk and Control Measures

在线阅读下载全文

作  者:邓爱平[1] 

机构地区:[1]广州市地下铁道总公司,广州助理工程师510380

出  处:《城市轨道交通研究》2013年第7期120-122,共3页Urban Mass Transit

摘  要:在终点站采用调车方式办理折返作业,是在终点站道岔或信号联锁、轨道电路等故障的情况下采用降级运营模式时的一种应急行车组织方法。介绍了道岔、信号联锁故障时在终点站以调车方式办理折返作业的乘务作业程序,分析了终点站采用调车方式办理折返作业时的危险源,提出了相应的控制措施。A terminal rail station has undoubtedly the main risk factors, the shunting turn-back is an emergency train organization adopted in case of failures at the terminal switch, signal interlock and track circuit. With an introduc- tion of the working process of terminal shunting turn-back and crew operation when there happens a switch failure, a signal interlocking failure, or a track circuit fault, then a degradation operation mode should be adopted. In this pa- per, the hidden risks in the shunting turn-back are ana- lyzed, some corresponding control measures are proposed.

关 键 词:地铁列车 终点站 调车折返作业 乘务风险  制措施 

分 类 号:U231.92[交通运输工程—道路与铁道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象