检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]国网电力科学研究院,江苏南京211106 [2]南京南瑞集团公司,江苏南京211106 [3]甘肃电投河西水电开发有限责任公司,甘肃张掖734000
出 处:《水电能源科学》2013年第7期70-72,共3页Water Resources and Power
摘 要:在无量水堰的前提条件下,为监测三道湾水电站坝基渗流量,在坝后覆盖层中布设测压管监测系统,在满足一定误差要求的条件下,依据水力坡降法推导出三道湾水电站坝后河床渗流量计算公式,计算得出2012年汛期坝后河床平均渗流量为58.06L/s,并基于坝后渗流的影响因素,提出增设坝肩绕渗监测系统的建议。In order to explore the seepage of the dam foundation, monitoring system of piezometer is arranged in over- burden foundation on the premise of no-measuring weir. The dam foundation seepage calculation formula of the ehannel is derived in Sandaowan hydropower station by using hydraulic gradient method, which meets the error requirement. The calculation of average seepage in flood season of 2012 is 58.06 L/s. Based on the influencing factors of dam seepage, the suggestion of adding monitoring system of by-pass seepage in abutment is put forward.
分 类 号:TV698.12[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.146.206.0