高压直流电路的开断及其能量吸收  被引量:8

The Interruption of the HVDC Circuit and Its Energy Absorption

在线阅读下载全文

作  者:吉嘉琴[1] 沈力[1] 张节容[1] 张力超[1] 

机构地区:[1]清华大学

出  处:《电工技术学报》1991年第4期11-15,10,共6页Transactions of China Electrotechnical Society

基  金:自然科学基金

摘  要:本文通过理论分析阐明了吸能装置在直流开断过程中的重要作用,作为算例对葛-上线的直流开断过程进行了计算分析,求得当开断电流为4000A在线路末端发生故障时,流过吸能装置的电流波形为8.8ms的矩形波,要求吸收的能量为10.29MJ。通过试验研究得出阀片在不同时间长度电流波形作用下的通流能力可以按照能量相等原则来进行换算。Energy absorber is an important component in HVDC CB.The analyses and cal- culations of the interruption process of the Gezhouba-Shanghai HVDC transmission line have been made, when interrupting current is 4000A, ground fault occurs at 1000 km far from the converter station, the dissipated energy in the absorber is 10.29MJ and the current duration is 8.8ms. In this paper the ZnO varistors were tested by the rectangular current with dura- tion 10ms.The capability of the ZnO varistors to carry current for 10ms is fairly high.For comparison the ZnO varistors were also tested by the rectangular current with shorter duration 2 ms.

关 键 词:高压 直流 断路器 吸能装置 

分 类 号:TM561.03[电气工程—电器]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象