检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《有色金属(冶炼部分)》2013年第6期22-25,共4页Nonferrous Metals(Extractive Metallurgy)
基 金:贵州省社会发展攻关项目(黔科合SY[2010]3011号);贵州省科技攻关项目(黔科合GZ字[2011]3013);贵州省教育厅重点项目(黔教科[2011]033号)
摘 要:针对镁热法生产海绵钛还原过程散热慢和还原周期长的问题,采用强制散热的方法,考察了海绵钛散热量对海绵钛质量、四氯化钛加料速度和还原生产周期的影响。结果表明,强制散热是海绵钛还原中期降低反应釜壁温度、提高海绵钛质量和四氯化钛加料速度、缩短还原周期的有效方法。With the aim to address slow heat dissipation and long period of reduction process existing in titanium sponge production by magnesium thermal reduction process,the effects of heat dissipating quantity on quality of titanium sponge,feeding rate of titanium tetrachloride,and reduction period were investigated with forced heat dissipation method.The results show that forced heat dissipation is effective to reduce temperature of reactor wall,improve quality of titanium sponge,increase feeding rate of titanium tetrachloride and shorten reduction period during medium-term reduction process of titanium sponge.
分 类 号:TF823[冶金工程—有色金属冶金] TF803.13
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117