北疆某重力坝高水头条件下更换底孔充水阀措施研究  被引量:2

Study on measures for replacing water filling valve under high head of a gravity dam in North Xinjiang

在线阅读下载全文

作  者:蔡立[1] 谌祖辉[1] 赵成先[1] 田雪竹[1] 朱宝荣 

机构地区:[1]新疆额尔齐斯河流域开发工程建设管理局,新疆乌鲁木齐830000 [2]中国水利水电第十六工程局有限公司,福建福州350003

出  处:《水利水电技术》2013年第7期51-53,共3页Water Resources and Hydropower Engineering

摘  要:北疆某重力坝底孔旁通充水阀因冬季冻裂漏水。在保证安全的前提下,采用封堵球、水下摄像头等设备,在规定的时间段内对其进行了更换,使其在短期内恢复了正常运行。这种特殊处理措施可为类似工程提供有益的借鉴和参考。The bypass water filling valve for the bottom outlet of a gravity dam in the North Xinjiang is leaked due to frost-crack caused in winter. The equipment of ball-sealer, underwater camera, etc. are adopted for replacing the valve in a specified period under the premise of ensuring the safety, and then the normal operation of the valve is recovered in a short period. This special treatment measure can provide a beneficial reference for the similar project concerned.

关 键 词:重力坝 充水阀 封堵球 水下摄像机 

分 类 号:TV663[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象