检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《纤维复合材料》2013年第2期49-50,54,共3页Fiber Composites
摘 要:给排水管道在干道下面埋设时,管顶覆土要采用振动压路机压实,在GB/T 20268-2008给水排水管道工程施工及验收规范中对此类管道设计未规范,造成此类管道无法依照《给水排水工程地埋玻璃纤维夹砂管管道设计规程》CECS190:2005设计管材。本文结合工程实践探讨玻璃钢夹砂管道在地埋浅覆土时,施工荷载计算、管道稳定计算、变形验算、管道回填施工对其影响。When water supply -drainage pipeline is being buried under main road, the earth covered on it should be compacted with vibratory roller. Design of this kind of pipeline is not stipulated in GB/T20268 - 2008 Code for Construc- tion and Acceptance of Water and Sewerage Pipeline Works, thus the pipe of this kind of pipeline can' t be designed ac- cording to the standard of CECS190:2005 Specification for Structural Design of Buried Glass Fiber Reinforced Plastic Mor- tar Pipeline of Water Supply and Sewerage Engineering. This paper is aimed to discuss the calculation of loading and pipe stablility, checking calculation of deflection, pipeline backfilling works.
关 键 词:玻璃钢管道(玻璃钢夹砂管道) 设计安装 浅覆土 激振力
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.45