基于有限元法的矿柱开采稳定性分析与优化  被引量:3

Stability Analysis and Optimization on Pillar Mining Based on the Finite Element Method

在线阅读下载全文

作  者:卢宏建[1,2] 张晋峰[1,2] 

机构地区:[1]河北联合大学矿业工程学院 [2]河北省矿业开发与安全技术重点实验室

出  处:《金属矿山》2013年第7期1-3,104,共4页Metal Mine

基  金:河北省科技支撑计划项目(编号:11276716D)

摘  要:基于武钢金山店铁矿矿柱现状,运用弹塑性有限元理论对矿柱开采可行方案进行了仿真模拟,对不同方案矿柱开采过程中围岩和地表的稳定性进行了分析。在对矿柱开采覆岩移动及地表变形规律进行总结的基础上,对金山店矿柱采用不同方案开采地表破坏区域进行了圈定,确定了合理的矿柱开采方案。Based on the pillar status of Jinshandian iron mine in WISCO,the feasibility scheme of the pillar mining is simulated by using elastic-plastic finite element theory and the stability of the surrounding rock and surface among the mining process by different scheme is analyzed.Based on all summaries about the pillar mining strata movement and surface deformation law,the damaged area in the surface during Jinshandian pillar mining with different mining schemes is delineated.Then,the reasonable pillar mining scheme is determined.

关 键 词:有限元法 矿柱开采 稳定性分析 方案优化 

分 类 号:TD862.1[矿业工程—金属矿开采]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象