某内庭式广场地下室上浮破裂机理与加固技术研究  被引量:11

Research on failure mechanism and reinforcement technology of up-floating basement of a chamber square

在线阅读下载全文

作  者:谢海舰[1,2] 吕恒林[1,2] 周淑春[1,2] 李体浩 

机构地区:[1]中国矿业大学力学与建筑工程学院,徐州221116 [2]江苏省土木工程环境灾变与结构可靠性重点实验室,徐州221116

出  处:《建筑结构》2013年第14期92-95,共4页Building Structure

基  金:中央高校基本科研业务费专项资金(2013DXS02)

摘  要:针对徐州某内庭式广场地下室上浮的事故,依据原资料审查、现场检测和抗浮设计复核,对地下室破裂机理进行了分析,分析结果表明,破裂主要原因为原抗浮设计不满足要求,且施工未能及时排水及回填土。针对地下室上浮后所产生的问题采用了"排"与"抗"两种措施进行处理,以满足后续正常使用的要求。Based on the original reviews,in-site detection and design reviews,failure mechanism was analyzed aiming at up-floating basement of a chamber square in Xuzhou.Results show that the unqualified anti-floating design is the main reason for the failure,while the delayed drainage of water and refill of soil lead to the failure as well.To meet the requirements of normal use,reinforcement measures of 'dewater' and 'resist' were adopted to deal with the problem caused by up-floating basement.

关 键 词:地下室上浮 抗浮设计 破裂机理 加固 

分 类 号:TU354[建筑科学—结构工程] TU312.3

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象