克孜加尔水利枢纽导流洞工程衬砌混凝土试验研究与应用  

Lining Concrete Experimental Research and Application in Kizil Hydro-Junction Diversion Tunnel Engineering

在线阅读下载全文

作  者:何若飞[1] 

机构地区:[1]新疆水利水电勘测设计研究院,乌鲁木齐830000

出  处:《水利建设与管理》2013年第7期45-46,44,共3页Water Conservancy Construction and Management

摘  要:本文通过工程实例对混凝土施工过程中C25泵送混凝土含气量难以控制、和易性较差、拆模后混凝土表面有蜂窝麻面,及在高温时段混凝土浇筑过程中,混凝土失水快、易风干、容易形成"硬结壳"、出现假凝现象等原因进行了分析,并提出了解决途径。During the concrete construction, it is difficult to control air content of C25 pumping concrete. C25 pumping concrete has poor workability and honeycomb pitting surface on the surface of the concrete after form stripping. Apart from that, during the process of concrete placing at high temperature, concrete loses water fast and is easy to be dried, which makes it form hard cnast easily and produce false condensation. The paper analyses the causes of the phenomenons above and proposes solutions.

关 键 词:导流洞衬砌 问题 试验 解决途径 应用效果 

分 类 号:TV551[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象