综放工作面顺槽取消设备列车技术实践  被引量:1

Practice of Cancelling Equipment Train Technology at Fully Mechanized Caving Face

在线阅读下载全文

作  者:张志强[1] 

机构地区:[1]郑煤集团白坪煤业公司,河南登封452481

出  处:《煤炭技术》2013年第7期64-66,共3页Coal Technology

摘  要:分析了综放工作面设备列车放置在上、下顺槽的弊端,选择将设备列车放在中部车场或者胶带运输机机头处,设计了远距离供电和远距离供液方案,避免了设备列车放置在上、下顺槽的弊端,减少了通风阻力,减轻了工人的劳动强度,提高了安全性。The disadvantages of placing the equipment train at the upper or down crossheading were analyzed. It was selected that the equipment train was placed at the central yard or the conveyor head. The program of the remote power supply and liquid supply was designed. The disadvantages of placing the equipment train at the upper or down crossheading were avoided. The wind resistance and labor intensity were reduced. The security was improved.

关 键 词:综放工作面 设备列车 供电 供液 

分 类 号:TD823.49[矿业工程—煤矿开采]

 