机构地区:[1]东北电力大学建筑工程学院,吉林吉林132012
出 处:《水电能源科学》2013年第8期188-191,共4页Water Resources and Power
基 金:吉林省科技发展计划基金资助项目(201105061);吉林省教育厅"十一五"科学技术研究基金资助项目(200843)
摘 要:针对输电塔装配误差引起的装配应力对输电塔承载力影响的问题,构建了输电塔桁梁混合有限元模型对装配应力进行计算及模拟,并施加外荷载计算分析存在装配应力时输电塔的极限承载力。计算结果表明,在90°大风工况下,单根杆件存在尺寸误差时对输电塔承载力影响较小,误差不宜超出杆长的1‰;多根杆件存在尺寸误差时,塔腿部位的误差杆件对承载力影响最大,极限承载力比正常情况低14.2%。In order to study the influence of assembly stress caused by the errors of transmission tower assembly on the carrying capacity, the mixed finite element model of transmission tower longeron is established to simulate assembly stress. The ultimate carrying capacity of transmission tower with the assembly stress is calculated under the action of load. The results show that under the conditions of 90~ wind, the influence of carrying capacity is little when there is only one pole existing size error in the transmission towers and the size error should smaller than 1%0 of the pole's length; when there are a number of poles which located at the tower leg existing size error will produce great impact on the ultimate carrying capacity of the transmission towers and it is less 14.2% than that of the normal situation.
关 键 词:输电塔 尺寸误差 装配应力 极限承载力 荷载步-位移曲线
分 类 号:TM753[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249