检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:Kevin Huang
出 处:《Engineering Sciences》2013年第4期86-91,共6页中国工程科学(英文版)
摘 要:Flexible flowlines and risers have been increasingly used for deepwater and ultra-deepwater field applications,partially because of its low submerged weight and better dynamic characteristics comparing to rigid pipelines. The offshore installation of flowline may have advantages as well. However,it has special needs for the in-stallation aids,and it is challenging to install tie-in structures due to its low bending stiffness. This paper is to present some of the challenges during a recent flexible installation project with a total of more than 100 km flexible flowlines,and 24 in-line sleds/pipeline end termination(PLET) in water depth up to 1 300 m.
关 键 词:FLEXIBLE INSTALLATION normal lay in-line sled PLET
分 类 号:TE95[石油与天然气工程—石油机械设备] O35[理学—流体力学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28