检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:楼金仙[1]
出 处:《吉林水利》2013年第8期42-45,共4页Jilin Water Resources
基 金:国家"十二五"科技支撑计划项目(2012BAB05B03)
摘 要:天白水电站布置在山区转平原入口的冲积扇上,枢纽消能防冲的方案设计关系到建筑物的安全和下游河床河岸的稳定。为改善其消能段的水流流态,提高效能效率,本文通过整体水工模型试验,在原设计方案的基础上,对消能段体形进行了优化,实际效果来看,推荐方案下消能段水流流态有了明显改善,消能效率也大幅提高,达到了较为理想的消能效果。Tianbai hydropower station lies in the alluvial fan where mountains area meets plain,design of energy dissipation and erosion relates to the safety of buildings and the stability of downstream bed and riverbank.This paper adopted integral hydraulic model tests to improve the water flow regime and the efficiency of energy dissipation,to optimize the shape of energy dissipation section based on the original design scheme.Results show that proposal scheme obviously improves the water flow regime and greatly increases the energy dissipation efficiency.It achieves the ideal energy dissipation effect.
分 类 号:TV651.1[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.69