检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:常建波[1] 张五一[1] 胡长江[1] 王巍[1]
出 处:《中国矿山工程》2013年第4期37-39,58,共4页China Mine Engineering
摘 要:谢一矿-780m中央轨道石门受连续动压影响,巷道变形严重,不利于安全生产,提出棚式锚喷注联合支护矿压治理技术并应用。通过矿压观测,证明该技术是一种行之有效的矿压治理技术,为深部地压治理或受连续采动影响的巷道矿压治理提供了参考。-780m central crosscut in Xieyi mine is influenced by continuous dynamic pressure and the tunnel deformation is very serious,and it goes against the safety production.The shed and bolt -shotcrete and grouting combination support technique was proposed and applied to control mine pressure.It is proved by mine pressure monitoring that this method is effective.It can provide conference for the deep mine and tunnel pressure control which was influenced by continuous mining dynamic pressure.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.63