机构地区:[1]辽宁省送变电工程公司,沈阳市110021 [2]国家电网公司交流建设分公司,北京市100052 [3]中国电力科学研究院,北京市100192
出 处:《电力建设》2013年第7期118-121,共4页Electric Power Construction
摘 要:为解决锦屏—苏南±800kV渝3标段展放标称截面900mm2导线时出现的导线上扬问题,通过分析上扬机理、模拟试验及现场试验等,找出了克服大截面多分裂导线上扬的新方法,使导线上扬问题得到有效解决。通过受力分析,推导出克服上扬力的计算公式,选择克服导线上扬用工器具。此方法在工程应用中保证了导线施工质量,提高了放线速度,降低了放线不安全因素,取得较好效果。In order to solve the conductor updip problem during the tension stringing of conductor with 900 mm2 nominal cross section occurred in Chongqing Section 3 of ± 800 kV Jinping-Sunan power transmission project, a new method that could overcome and effectively solve the updip problem of large cross-section bundled conductor has been found, through the analysis on updip mechanism, simulation tests and field tests. Then, through the force analysis, the calculation formula to overcome the updip force was deduced, and the apparatus that could overcome the updip problem were chosen. In the engineering application, this method could achieve good effect in construction, such as ensuring the conductor construction quality, improving the stringing speed, and reducing the unsafe factors of stringing.
关 键 词:大截面多分裂导线 放线滑车悬挂 导线上扬 张力放线
分 类 号:TM751[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.112