检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《中国仪器仪表》2013年第7期50-53,共4页China Instrumentation
摘 要:田湾核电站是国内首家采用全数字化仪控系统的核电机组。在电站运行阶段,质量保证人员将仪控专业大修活动的质量保证管理作为一项重要课题,进行了不同的尝试和有益的探索。本文重点介绍了电站针对仪控专业特点建立的大修项目质量保证管理方法,并对其中质量保证管理的良好实践进行了简要的描述。Tianwan Nuclear Power Station(TNPS)is the first company to use the full digital IC system for nuclear power plant.In the stages of Design,procurement and installation commissioning,the Management of full digital IC system have its distinctive special characteristics.In the operation stage,the quality assurance personnel take the quality assurance management of IC in the Outage as an important subject,and make different attempts and exploration.In view of the particularity for IC specialty and its outage,and the quality management characteristics in TNPS outage,this paper introduces the method of outage project quality assurance management that established in allusion to IC specialty,and even introduces the useful practice on the quality assurance anagement.
分 类 号:TM623[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3