检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]广州穗监工程质量安全检测中心,广州510150 [2]广州市交通工程质量监督站,广州510378
出 处:《长春工程学院学报(自然科学版)》2013年第2期14-17,共4页Journal of Changchun Institute of Technology:Natural Sciences Edition
摘 要:对广州某连续刚构桥两套切割方案进行对比,分析初始切割线和切割方法对拆除过程和桥梁保留部分的影响。从梁体承载力、桥墩承载力及梁端的变形三方面进行分析,确定最佳的初始切割线。对两种切割方法中桥墩的受力进行对比分析,选择对称切割法进行切割。By comparing two sets of cutting programs in a continuous rigid frame bridge in Guangzhou, the paper analyzes the initial cutting line and the influence of cutting method to demolish process and the re- main part. From three aspects analysis of bearing capacity of the beam,bearing capacity of the pier and de- formation of the beam end,it determines the optimized initial cutting line. The forces of two piers cutting programs are analyzed, and the symmetrical cutting method for cutting is selected.
分 类 号:U446.2[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229