检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《长江科学院院报》2013年第8期1-4,共4页Journal of Changjiang River Scientific Research Institute
摘 要:泵站、电站进水口分层布置,可充分利用河谷宽度,减少工程开挖量。但在此布置下,泵站开启过程对电站进水口可能形成不利的水流流态,影响电站的正常运行。针对以上问题,结合动网格技术,采用k-ε紊流模型对某枢纽泵、电站分层布置进水口水力特性进行了三维数值模拟,通过分析电站进水口附近水体的压力变化,解析泵站开启对电站正常运行的影响。结果表明泵站开启过程对电站正常运行有一定的影响。The multi-level intake of pumping station and hydropower station makes full use of the river valley width and reduces the amount of engineering excavation. However, the opening of pumping station' s valve might give rise to adverse water flow pattern at the intakes and affect the normal operation of hydropower station. By employing dy- namic mesh technique and adopting k-ε eddy flow model, we carried out 3-D numerical simulation on the hydraulic characteristics at the multi-level intakes of a pumping station and hydropower station. By analyzing the water pres-sure variation in the vicinity of the intakes, we conclude that the opening of pumping station' s valve have certain impact on the normal operation of hydropower station. Under the same reservoir water level, the maximum water pressure fluctuation when the gate is gradually opened is half of that when the gate is instantaneously opened.
分 类 号:TV732.1[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.112