检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《长江科学院院报》2013年第8期14-17,20,共5页Journal of Changjiang River Scientific Research Institute
摘 要:采用三维数值模拟结合物理模型试验的方法,对某水电站表孔、中孔及其末端的跌坎式底流消力池的水流三维流场进行了计算分析和试验研究。分别比较了跌坎高度、消力池深度、跌坎水平长度以及出口侧收缩等对跌坎式底流消力池水流结构及相关水力特征量的影响,优选了水力特征量相对较好的跌坎式消力池结构布置型式,可为工程设计提供参考。In this research, the three-dimensional flow field of the surface-holes, mid-holes and the stilling basin with step-down floor of a hydropower station was simulated by 3-D numerical simulation and model test. We modi- fied the shape of the step-down floor from four aspects : the height of the steps, the depth of the stilling basin, the length of the horizontal platform in front of the step-down floor, and the side contraction at the outlet, and compared their effects on the flow structure and the characteristics of the stilling-basin. Results show that all these measures could reduce the bottom velocity and fluctuating pressure on the floor. In particular, increasing the flat length obvi- ously reduces fluctuating pressure and the velocity at the drop location of jet flow, but has large construction work- load; while side contraction at the outlet effectively changes th velocity and fluctuating pressure, and in the meantime has less neering design. e horizontal and longitudinal distribution of bottom workload. The result could be a reference for engi-neering design.
分 类 号:TV135.21[水利工程—水力学及河流动力学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145