某铀矿应用横撑支柱留矿法的探讨  被引量:1

Feasibility study of application of stulled shrinkage stoping in a uranium mine

在线阅读下载全文

作  者:李从飞 

机构地区:[1]中核抚州金安铀业有限公司,江西乐安344301

出  处:《铀矿冶》2013年第3期113-115,共3页Uranium Mining and Metallurgy

摘  要:某铀矿对于围岩不稳固、急倾斜薄矿体主要采用浅孔留矿法进行回采。该采矿法回采安全性差,贫化率高,经济效果差。若采用横撑支柱留矿法回采,将会有效地解决上述问题。Due to its own production limitation, normal shallow hole shrinkage stoping was used to mine steep thin ore bodies with unstable surrounding rock in a uranium mine. The method brought about low mining safety eoeffcient,high dilution rate and poor economic effect during mining. The feasibility of adopting the stulled shrinkage stoping to mine the ore bodies are studied, and the stulled shrinkage stoping is compared with the shallow hole shrinkage stoping. It is considered that the above problems can be solved by using the stulled shrinkage stoping.

关 键 词:铀矿 不稳固围岩 急倾斜薄矿体 横撑支柱留矿法 

分 类 号:TD868[矿业工程—金属矿开采]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象