检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《工业建筑》2013年第8期94-97,共4页Industrial Construction
摘 要:管桩与承台的连接节点是结构的薄弱环节,在地震发生时容易破坏继而造成严重的后果。通过改变管桩与承台的连接形式,对结构施加水平低周反复作用模拟地震作用,研究管桩的荷载-位移滞回、延性等方面的性能。试验结果表明:填芯管桩内增设非预应力钢筋对于提高管桩的承载能力有良好的效果,以非预应力钢筋作为连接钢筋以一定角度插入承台体内连接承台和管桩,对于结构节点的抗震耗能和节点延性的提高效果十分显著。Prestressed concrete pipe pile is applied widely.Pipe pile and pile cap joints are structural weaknesses that can easily break under a earthquake,thus resulting in serious consequences.By changing the connection form of a pipe pile and pile cap,and imposing cyclic loading on the structure to simulated seismic wave,it was studied on pipe pile load-displacement hysteresis,ductility etc.Test results showed that adding non-prestressed rebar within the filled pipe pile could increase evidently the bearing capacity of pipe piles;and using to non-prestressed rebar dowels inserted at an angle in the connection between the cap and pipe pile could have a great improvement on the structural ductility and seismic energy dissipation of the joint.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3