泥水平衡式曲线顶管施工阶段技术研究  被引量:2

Slurry Balance Type Curve Pipe Jacking Construction Technology Research

在线阅读下载全文

作  者:吴荣荣 

机构地区:[1]厦门电力工程集团有限公司,福建厦门361000

出  处:《工程建设与设计》2013年第9期113-115,119,共4页Construction & Design for Engineering

摘  要:泥水平衡式顶管施工以其作业性能好、总顶力较小及施工进度快等优点受到顶管工程界的肯定,但其在施工过程中如果控制不当,将造成地面塌陷、污染环境及泥浆突涌等现象,特别是在曲线顶管测量控制不当的情况下问题更加突出。从泥浆配制、泥浆分离、曲线段测量及压密注浆技术四方面来探讨泥水平衡式曲线顶管施工阶段技术控制措施,为同类工程施工提供借鉴。Type of slurry balance pipe j acking construction is sure by pipe j acking engineering with its good operating performance, small total jacking force, and the advantages of fast construction progress. However improper control in construction process will lead to ground subsidence, the phenomenon such as environmental pollution and slurry outburst flood, especially under the condition of the curve pipe jacking. This study discusses slurry balance type curve pipe jacking construction technology control measures in four aspects, such as slurry preparation, slurry separation, slurry curve segment measurement and pressure grouting technology, providing reference for the similar engineering construction.

关 键 词:泥水平衡 顶管 曲线 施工技术 

分 类 号:TU990.3[建筑科学—市政工程] TU994

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象