检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]郑州大学国际学院,河南郑州450052 [2]郑州大学水利与环境学院,河南郑州450002
出 处:《净水技术》2013年第4期56-60,共5页Water Purification Technology
摘 要:试验对3组生产性IC反应器的启动过程进行了研究。这3组生产性IC反应器在进水COD平均浓度约15 700 mg/L时,出水COD去除率均达到95%以上,都能够完成启动过程。采用颗粒污泥接种的IC反应器启动时间为136 d;采用絮状污泥接种的IC反应器启动时间为187 d。当絮状污泥分批次欠量投入IC反应器时,部分种泥因失去活性而使得IC未能达到设计负荷。The start-up process of three industrial-scale IC reactors was studied in this experiment. The results show when influ- ent COD is 15 700 mg/L, COD removal rate of three IC reactors can reach 95 % and start up successfully. It takes 136 days to finish the start-up process using granular sludge. It takes 187 days to finish the start-up process using flocculent sludge. When less floccu- lent sludge put into anaerobic reactor in different time, part of sludge loses activity, which makes IC reactor fail to meet the design load.
分 类 号:X506[环境科学与工程—环境工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249