沿断层布置不规则综放工作面煤巷支护技术  被引量:5

Support Technology of Seam Gateway of Irregular Fully-Mechanized Top Coal Caving Mining Face Along Fault Layout

在线阅读下载全文

作  者:徐亚民 

机构地区:[1]枣庄矿业(集团)付村煤业有限公司,山东微山277605

出  处:《煤炭科学技术》2013年第9期169-172,共4页Coal Science and Technology

基  金:中国煤炭工业协会科学技术研究指导性计划资助项目(MTKJ2009-164)

摘  要:针对付村煤矿3上401不规则综放工作面沿断层托顶煤巷道支护出现的顶板破碎、漏顶、变形量大等问题,通过现场调查、FLAC3D数值模拟分析和现场试验,研究了放顶煤开采沿断层托顶煤巷道围岩变形规律和控制技术,提出采用锚杆+锚索+钢筋梯+金属网支护可使围岩形成有效承载体,能使不规则综放工作面沿断层托顶煤巷道整体稳定。3上401回风巷工程实践表明,巷道掘进5个月后,巷道顶、帮部锚杆最大变形量分别为18和32 mm,支护效果良好。According to the roof broken, roof leakage, high deformation and other problems occurred in the support of the seam gateway with the suspended top coal along the fault in No.3 up 401 irregular fully-mechanized top coal caving mining face in Fueun Mine, with the site investigation, FLAC3D numerical simulation analysis and site test, the paper had a study on the surrounding rock deformation law and con- trol technology of the mining gateway with the suspended top coal along the fault in the fully-mechanized top coal caving mining face.The bolt + anchor + reinforced bar ladder + steel mesh support applied to the surrounding rock to form an effective loading body could be the key to keep the integrated stability of the seam gateway with the suspended top coal along the fault in the fully-mechanized top coal caving mining face.The engineering practices of the air retuning gateway in No.3 up 401 coal mining face showed that after five months of the gate- way driven,the max deformation value of the bolts in the roof and sidewall of the gateway was 18 and 32 mm individually and the support effect was excellent.

关 键 词:不规则工作面 片帮漏顶 托顶煤 应力分布 围岩控制 

分 类 号:TD353[矿业工程—矿井建设]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象