积石峡水电站施工导流设计概述  被引量:6

General Description of Design of Construction Diversion,Jishixia Hydropower Project

在线阅读下载全文

作  者:许建军[1] 林万旭[2] 权锋[2] 

机构地区:[1]黄河上游水电开发有限责任公司,西宁810008 [2]中国水电顾问集团西北勘测设计研究院,西安710065

出  处:《西北水电》2013年第4期50-52,共3页Northwest Hydropower

摘  要:积石峡水电站采用土石围堰一次拦断河床、大坝基坑全年施工、左岸隧洞过流的施工导流方式。主河床截流后枯水期导流洞单独泄流,汛期导流洞与泄洪排沙底孔联合泄流。该工程施工期的洪水流量选择充分利用了河段梯级上游龙头水库龙羊峡水电站的调洪控泄作用,导流洞下游段与中孔泄洪洞结合,且汛期利用泄洪排沙底孔参与导流,减小了导流建筑物规模,节约了工程投资,取得了较好的技术经济效益。In construction of Jishixia Hydropower Project, the river is closed by the earthrock cofferdam once and the river flow is diver ted through the diversion tunnel on left bank so that the construction activities in the foundation pit could be executed the year round. At2 ter the main riverbed is closed, the river flow in the lowwater period is discharged by the diversion tunnel individually ; in the flood sea stm, by the diversion tunnel and the bottom outlet together. During the project construction, the function of the flood control by the up stream Ltmgyangxia Hydropower Station is fully utilized to control the incoming discharge, the downstream section of the diversion tunnel combines the middle flood discharge tunnel and the bottom outlet is applied for the flood diversion in the flood season so that the scale of the diversion structure is decreased, investment is reduced and a expected technical & economic benefits are gained.

关 键 词:积石峡水电站 施工导流 导流规划 导流隧洞 

分 类 号:TV551.1[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象